OFFICES – MORNANT (FRANCE)
Location MORNANT (FRANCE)
COMPLETION DATE 2012
SURFACE AREA 5221 Ft2
COMPLETION DATE 2012
SURFACE AREA 5221 Ft2
Construction of offices.
Throughout the building, the cladding is in sandwich panels. The timber construction office structure is on two levels, glue-laminated structure, reinforced concrete basement and staircase, underfloor heating and wood pellet boiler.
Our other references